Photographs of
Layout Progress
Roseville (west-end staging)
|
Summer '99 - Room preparation in the area where Roseville (lower deck) and Sacramento (upper deck) will be. |
Summer '99 - Sub-roadbed (5/8" plywood) is in. Mainline curve up to Placerville yard in the background also has sub-roadbed in place. This grade was later reduced when the Placerville peninsula was lowered about 3". |
|
Placerville Yard
Summer '99 - Benchwork for the Placerville peninsula. |
|
Summer '99 - Backdrop structure going in. |
Smith Flat
Summer '99 - view of back side of Placerville's backdrop. |